DAILY MANUFACTURING × TIN TECH PACKAGING
Daily brings the demand.
Tin Tech builds the dedicated supply operation around it.
Daily commits the six-month demand. Tin Tech builds the tooling, capacity, logistics and visibility around it.
01 / 06
STUDIO RENDER · REAL PROTOTYPE REFERENCE
Short + Tall body prototypes. Final production details lock after drawings and sample approval.
THE PRODUCT SYSTEM
Two sizes.
One system.
Two finished plastic containers. One shared closure architecture. Four dedicated molds.
SELECTED VIEW / SHORT BODY
Short plastic container
A compact body within the shared closure system. Final geometry is confirmed through engineering drawings and sample approval.
REFERENCE-BASED COMPONENT STUDY
FOUR-MOLD ARCHITECTURE
$80,000 total tooling.
Dedicated mold 01 of 04 · Short cup body.
$20,000 / moldFinal dimensions, tolerances and technical specifications follow approved engineering drawings and production samples.
THE SIX-MONTH PURCHASE PROGRAM
Volume commits the price.
Program pricing is based on the committed six-month monthly volume tier.
SELECTED / CORE
1,100,000 UNITS / MONTHPLANNED MONTHLY MIX
600,000 Short
+ 500,000 Tall
Recommended Core allocation. Confirmed with Daily before engineering lock.
FUNDING + TOOLING STRUCTURE
Choose how the operation starts.
Every route funds the same six-month product program. What changes is the advance, tooling position and payment timing.
SELECTED ROUTE / 60% — TIN TECH INVESTS
Tin Tech funds all four molds.
Daily’s 60% product advance is fully credited against purchases. There are no further product payments during engineering, tooling, setup, initial production or transit.
The remaining product balance is distributed across the delivery cycles left in the six-month program after the first commercial U.S. delivery. The number of installments follows actual delivery timing.
WHAT TIN TECH BUILDS AROUND THE PROGRAM
A dedicated Daily Manufacturing production operation.
Within Tin Tech’s manufacturing system.
Tin Tech is committing dedicated machinery and production infrastructure in addition to the tooling program.
DELIVERED PROGRAM
Factory to Daily’s U.S. door.
DAP — Daily Manufacturing receiving facility, California. Final receiving address confirmed at contract / PO.
SELECTED PROGRAM LOGISTICS
3 × 40HQ / month.
Confirmed monthly container program.
Confirmed allocation: 600,000 Short + 500,000 Tall across three 40HQ containers.
DAP · INCOTERMS® 2020 Working logistics location: Rancho Cucamonga, California 91730.
Delivered program pricing is based on the agreed freight assumptions at execution. Extraordinary carrier surcharges, government charges, tariff changes, port disruptions or material freight movements may trigger a transparent logistics review.
ACTIVATION TIMELINE
Kickoff to delivered commercial stock.
Planning target: approximately 4–4.5 months, assuming timely approvals and normal transit.
Program activated.
Supply agreement signed and selected funding route paid.
* Day 30 is measured from the start of tool fabrication. Timing is a planning target, not an absolute guarantee.
THEN THE PROJECT ENDS.
AND THE SUPPLY SYSTEM BEGINS.
The first commercial delivery is not the finish line. It is where the recurring supply system starts working.
TIN TECH LIVE · FUTURE CONTROL VIEW
Your production.
Visible.
Daily should never need to ask us where production stands.
Demonstrative interface only. Values shown here are examples of future visibility, not current production facts.
THE OPERATING AGREEMENT
Clear commitments.
One accountable system.
DAILY COMMITS
- Select monthly volume tier.
- Commit to six-month program.
- Select funding and tooling structure.
- Approve drawings and samples promptly.
- Confirm U.S. receiving destination.
- Confirm Short / Tall requirements.
- Maintain agreed payment and release schedule.
TIN TECH COMMITS
Four molds. Dedicated production infrastructure. Reserved capacity. Assigned operators.
QC, material planning, packing, export coordination, delivered logistics, live visibility and partner-level accountability.
From tooling through delivered containers, responsibility stays with Tin Tech.YOUR CONFIGURED STRUCTURE
One decision view.
Everything below updates with the volume and funding choices above.
Confirm the preferred commercial structure so Tin Tech can prepare final engineering drawings, delivery details, supply agreement and blanket purchase order.
We’re building more than four molds. We’re building the supply operation Daily can grow on.
This interactive proposal is for commercial discussion. Final technical specifications, packing configuration, delivery address, Incoterms, payment dates and legal terms are confirmed in the executed supply agreement and purchase order.